[1]
ahmad, A. and Dahlan, muhammad 2025. Performance Measurement of a Construction Consulting Company Using Integrated Performance Prism and Fuzzy Analytical Hierarchy Process (Fuzzy AHP). Journal of Industrial System Engineering and Management. 4, 1 (Jun. 2025), 35–51. DOI:https://doi.org/10.56882/jisem.v4i1.79.