Training Balance Analysis Of 3 Kg LPG Tube Retester Repair Using Ranked Positional Weight Method In PT. Earth Trans Energy Wajo Regency South Sulawesi Province
DOI:
https://doi.org/10.56882/jisem.v1i1.1Keywords:
Line Balancing;, Register Repair, Ranked Positional WeightAbstract
PT. Bumi Trans Energi is one of the companies engaged in 3 Kg LPG cylinder retested repair, this company repairs 3 Kg LPG cylinders that have been damaged for 5 years, damage to the handguard, and footring, and welded joints on the tube. In the repair process, there are 5 stations and 21 work processes, PT. Bumi Trans Energi encountered a problem in the repair line at station 1, and a bottleneck occurred. This bottleneck occurs because the production flow is not smooth from one station to the next, this problem causes each work station in the repair path to have a different speed level, which causes material accumulation between work stations, and waiting times between work stations. For this reason, this study aims to determine the number of workstations needed to get maximum efficiency and balance the repair process line when bottlenecks occur. Observations were made in data collection 30 times, each work element was observed and calculated in the data uniformity test and data adequacy test to obtain standard time. The results of this study were the application of 3 work stations from 5 initial work stations, there was a reduction in idle time to 425,74 seconds ( 7 minutes) following the increase in track efficiency to 84,17 % the balance delay decreased to 15,83 %, and the Smoothness Index was 212,63. The actual idle time was 1004,97 seconds (17 minutes) while the proposed trajectory idle time used the Ranked Positional Weight method of 425,74 seconds (7 minutes). The difference between actual and proposed idle time is 10 minutes, and the placement of work elements at work station 1 (one) consists of 9 work operations, while work stations 2 (two) consist of 1 work process, and work stations 3 ( three ) consist of 8 work processes
References
R. N. Fathia, S. Batubara, and D. M. Safitri, “USULAN PENGURANGAN WAKTU SETUP MENGGUNAKAN METODE SMED SERTA PENGURANGAN WAKTU PROSES PRODUKSI DAN PERAKITAN MENGGUNAKAN METODE MOST DI PT. PANASONIC MANUFACTURING INDONESIA,” J. Tek. Ind., vol. 6, no. 2, Jul. 2016, doi: 10.25105/jti.v6i2.1543.
S. AKSOY, M. S. YILDIZ, and S. ALTINOVA, “USE OF RANKED POSITION WEIGHTED METHOD FOR SINGLE MODEL U-TYPE ASSEMBLY LINE BALANCING,” İktisadi ve İdari Bilim. Fakültesi Derg., vol. 16, no. 2, pp. 83–89, Dec. 2014, doi: 10.5578/jeas.7701.
I. Kucukkoc and D. Z. Zhang, “Type-E parallel two-sided assembly line balancing problem: Mathematical model and ant colony optimisation based approach with optimised parameters,” Comput. Ind. Eng., vol. 84, pp. 56–69, Jun. 2015, doi: 10.1016/j.cie.2014.12.037.
J. Sternatz, “The joint line balancing and material supply problem,” Int. J. Prod. Econ., vol. 159, pp. 304–318, Jan. 2015, doi: 10.1016/j.ijpe.2014.07.022.
I. Dharmayanti and H. Marliansyah, “PERHITUNGAN EFEKTIFITAS LINTASAN PRODUKSI MENGGUNAKAN METODE LINE BALANCING,” J. Manaj. Ind. dan Logistik, vol. 3, no. 1, pp. 45–56, May 2019, doi: 10.30988/jmil.v3i1.63.
Y. D. Dinanty and S. Batubara, “PERANCANGAN SISTEM P-KANBAN DAN C-KANBAN UNTUK MEMINIMASI KETERLAMBATAN MATERIAL PADA LINI PRODUKSI PERAKITAN LAUNDRY SYSTEM BUSINESS UNIT (LSBU) DI PT. Y,” J. Tek. Ind., vol. 6, no. 3, Nov. 2016, doi: 10.25105/jti.v6i3.1549.
H. K. Salim, K. Setiawan, and L. P. Hartanti, “PERANCANGAN KESEIMBANGAN LINTASAN PRODUKSI MENGGUNAKAN PENDEKATAN SIMULASI DAN METODE RANKED POSITIONAL WEIGHTS,” J@TI UNDIP J. Tek. Ind., vol. 11, no. 1, Feb. 2016, doi: 10.12777/jati.11.1.53-60.
.. S., M. HAMBALI, and T. MUHADI RAHMAN, “PENYEIMBANGAN LINTASAN PRODUKSI DENGAN METODE HEURISTIK (STUDI KASUS PT XYZ MAKASSAr),” J. Tek. Ind., vol. 15, no. 2, p. 182, Mar. 2016, doi: 10.22219/JTIUMM.Vol15.No2.182-189.
L. N. I. S. S. Sinulingga, “PENYEIMBANGAN LINTASAN PADA PERAKITAN TRANSFORMATOR DENGAN METODE MOODIE YOUNG DAN COMSOAL PADA PT. XYZ,” J. Tek. Ind. USU, no. Vol 3, No 4 (2013): Jurnal Teknik Industri USU, 2013, [Online]. Available: https://jurnal.usu.ac.id/index.php/jti/article/view/6035/pdf
S. Batubara and F. Nuradhi, “PENYEIMBANGAN LINI PERAKITAN MENGGUNAKAN METODE GENETIC ALGORITHM UNTUK MENINGKATKAN KAPASITAS PRODUKSI,” J. Tek. Ind., vol. 7, no. 2, Oct. 2017, doi: 10.25105/jti.v7i2.2214.
I. Fardiansyah and T. Widodo, “PENINGKATAN PRODUKTIVITAS MENGGUNAKAN METODE LINE BALANCING PADA PROSES PENGEMASAN DI PT.XYZ,” J. Ind. Manuf., vol. 3, no. 1, Jan. 2018, doi: 10.31000/jim.v3i1.621.
R. Prabowo, “PENERAPAN KONSEP LINE BALANCING UNTUK MENCAPAI EFISIENSI KERJA YANG OPTIMAL PADA SETIAP STASIUN KERJA PADA PT. HM. SAMPOERNA Tbk,” J. IPTEK, vol. 20, no. 2, p. 9, Dec. 2016, doi: 10.31284/j.iptek.2016.v20i2.25.
S. P. Yudha, Pratikto, and I. P. Tama, “MENINGKATKAN EFISIENSI LINTASAN PERAKITAN PLASTIC BOX 260 MENGGUNAKAN PENDEKATAN METODE HEURISTIK,” Proceeding SENDI_U, vol. 0, no. 0 SE-Articles, Jan. 1970, [Online]. Available: https://www.unisbank.ac.id/ojs/index.php/sendi_u/article/view/5043
I. Purnamasari and A. S. Cahyana, “LINE BALANCING DENGAN METODE RANKED POSITION WEIGHT ( RPW),” SPEKTRUM Ind., vol. 13, no. 2, p. 157, Oct. 2015, doi: 10.12928/si.v13i2.2693.
H. H. Azwir and H. W. Pratomo, “Implementasi Line Balancing untuk Peningkatan Efisiensi di Line Welding Studi Kasus: PT X,” J. Rekayasa Sist. Ind., vol. 6, no. 1, p. 57, Apr. 2017, doi: 10.26593/jrsi.v6i1.2428.57-64.
F. D. Hanggara, “FACILITY LAYOUT PLANNING IN SMALL INDUSTRY TO INCREASE EFFICIENCY (CASE STUDY: BIG BOY BAKERY, BATAM, KEPULAUAN RIAU, INDONESIA),” J. Ind. Eng. Manag., vol. 5, no. 2, pp. 72–81, Nov. 2020, doi: 10.33536/jiem.v5i2.571.
M. Dahlan et al., “DETERMINATION OF THE OPTIMAL NUMBER OF EMPLOYEES USING THE FULL TIME EQUIVALENT (FTE) METHOD AT PT. XYZ,” J. Ind. Eng. Manag., vol. 6, no. 3, pp. 74–81, Dec. 2021, doi: 10.33536/jiem.v6i3.1071.
R. M. Mondina, E. Roslinda, and G. Hardiansyah, “EFISIENSI TENAGA KERJA PRODUKSI KAYU LAPIS MENGGUNAKAN METODE LINE BALANCING DI PT. HARJOHN TIMBER LTD,” J. HUTAN LESTARI, vol. 7, no. 2, Jul. 2019, doi: 10.26418/jhl.v7i2.34071.
M. Dahlan, A. Ahmad, A. Pawennari, and W. Alimuddin, “Pengendalian Persediaan Bahan Bakar Solar Menggunakan Model Probabilistik pada SPDN Baji Pamai Maros,” Conf. Senat. STT Adisutjipto Yogyakarta, vol. 7, Mar. 2022, doi: 10.28989/senatik.v7i0.443.
S. GHOSH and R. J. GAGNON, “A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems,” Int. J. Prod. Res., vol. 27, no. 4, pp. 637–670, Apr. 1989, doi: 10.1080/00207548908942574.
S. Ariyanti, M. Rifa’i Azhar, and M. S. Yamin Lubis, “Assembly Line Balancing with The Yamazumi Method,” IOP Conf. Ser. Mater. Sci. Eng., vol. 1007, no. 1, p. 012078, Dec. 2020, doi: 10.1088/1757-899X/1007/1/012078.
M. Djunaidi and . A., “ANALISIS KESEIMBANGAN LINTASAN (LINE BALANCING) PADA PROSES PERAKITAN BODY BUS PADA KAROSERI GUNA MENINGKATKAN EFISIENSI LINTASAN,” J. Ilm. Tek. Ind., vol. 5, no. 2, Apr. 2018, doi: 10.24912/jitiuntar.v5i2.1788.
Y. Herdianzah, “KRI DESIGN AND MITIGATION STRATEGY ON WATER DISTRIBUTION OF PERUMDA AIR MINUM MAKASSAR REGIONAL IV: A Case Study,” J. Ind. Eng. Manag., vol. 5, no. 2, pp. 70–79, Nov. 2020, doi: 10.33536/jiem.v5i2.672.
Y. Herdianzah et al., “DESAIN JALUR EVAKUASI PENGGUNA BANGUNAN PADA KONDISI DARURAT DI GEDUNG FTI- UMI LANTAI IV MENGGUNAKAN ALGORITMA FLOYD WARSHALL,” J. REKAYASA Sist. Ind., vol. 7, no. 2, pp. 48–51, May 2022, doi: 10.33884/jrsi.v7i2.4536.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Journal of Industrial System Engineering and Management