Analysis of Work Measurement Using the Stopwatch Time Study Method at PTEA

Authors

  • masniar masniar Universitas Muhammadiyah Sorong
  • Umar Rusli Marasabessy Universitas Muhammadiyah Sorong
  • Engelberto Astrides Universitas Muhammadiyah Sorong
  • Asih Ahistasari Universitas Muhammadiyah Sorong
  • Mohammad Arief Nur Wahyudien Universitas Muhammadiyah Sorong
  • Mirga Maulana Rachmadhani Universitas Muhammadiyah Sorong

DOI:

https://doi.org/10.56882/jisem.v2i1.14

Keywords:

Stopwatch Time Study, Work Sampling, Work Measurement

Abstract

In the era of globalization or the world of free trade, competition in the industrial world is increasing rapidly, this causes business competition to increase. Seeing the importance of measuring every activity carried out by the company, an accurate measurement method is needed to be able to provide accurate information on the time needed and the efficiency of each product activity in meeting production targets to achieve profits. The Stopwatch Time Study method is a work measurement technique using a stopwatch as a means of measuring the time shown in the completion of an observed activity. From the measurement results, a standard time will be obtained to complete a work cycle, where this time will be used as a standard for completing work for all workers who will carry out the same work as that. To determine the standard time, first calculate the cycle time and the time normal considering the degree of adjustment and allowance. Based on the results of data processing and discussion, it can be concluded that the lowest normal time is for employee 2 with a time of 39.05 seconds. Employee adjustment factor 2 with a total adjustment of +0.12 and employee allowance factor 2 with a total allowance of 22.

References

D. Putra. P., Jaenudin., and D. Taurusyanti. Penerapan Waktu Standar Pada Karyawan Dalam Rangka Mencapai Efektifitas Volume Produksi Pada Pt. Nina Venus Indonusa II. Jurnal Online Mahasiswa (JOM)Bidang Manajemen, vol. 3. no.1, 2018, pp, 1-18.

A. Kadim. Penerapan Manajemen Produksi & Operasi Di Industri Manufaktur.2017

R. Afiani., and D. Pujotomo. Penentuan Waktu Baku dengan Metode Stopwatch Time Study Kasus CV. MANS Group. Industrial Engineering Online Jounal, vol. 6, no.1. 2017

T. Bodroastuti. Faktor-Faktor Yang Mempengaruhi Produktivitas Kerja (Studi Pada Karyawan Bagian Produksi PT Mazuvo Indo). Jurnal Kajian Akuntansi dan Bisnis, vol. 1, no. 1. 2017

A. Firman, A. Analisis Pengukuran Kinerja Untuk Meningkatkan Produktivitas menggunakan Metode Time Study Danwork Sampling (Studi Kasus Pada PT Kebon Agung Malang). Sinteks: Jurnal Teknik, vol.8, no.1, 2019, pp. 30-35.

Z. Faziati, N. Analisis Pengukuran Kerja Dalam Menentukan Waktu Standar Dengan Metode Studi Waktu Guna Meningkatkan Produktivitas Kerja Pada Shuttlecock PT. Garuda Budiono Putra. Universitas Pancasakti Tegal.2019

A. Almaidah., A. Karyanto., K. Putra., and Wariori. R. Y. Laporan Praktikum Analisis Perancangan Kerja Penelitian Pengukuran Cara Kerja. 2021

H. Notopramono. Analisis Beban Kerja dengan Metode Stopwatch Time Study Untuk Penentuan Jumlah Operator Optimal (Doctoral dissertation, Universitas Brawijaya). 2016

H. Damayanthi., and S. Hidayat. Pengukuran Waktu Baku Stasiun Kerja Pada Pipa Jenis Sio Menggunakan Metode Jam Henti di PT. XYZ. In Seminar dan Konferensi Nasional IDEC 2020, pp. 1-9. 2 november 2020

S. Reksohadiprodjo and H. Handoko. Organisasi Perusahaaan. Edisi 2. Yogyakarta. BPFE, 1999

N. Sukma., F. Hidayat., and S. Anggarini,. G. Utomo, W. Analisis perhitungan waktu baku dengan menggunakan metode jam henti pada produk pulley di CV. Putra mandiri jakarta. Jurnal PASTI, Vol. XII, no, 1, 2013, pp. 119-136.

A. Yuda, P., and F. Pulansari. Analisis pengukuran waktu kerja dengan stopwatch time study untuk meningkatkan target produksi di PT. XYZ. JUMINTEN, vol. 2, no. 1, 2021, pp. 13-24.

Rully, T., and Rahmawati, N. T. Perencanaan Pengukuran Kerja Dalam Menentukan Waktu Standar Dengan Metode Time Study Guna Meningkatkan Produktivitas Kerja Pada Divisi Pompa Minyak Pt Bukaka Teknik Utama Tbk. Jimfe (Jurnal Ilmiah Manajemen Fakultas Ekonomi), Vol.1, no. 1, 2015, pp. 12-18.

N. Yudisha. Perhitungan waktu baku menggunakan metode Jam Henti pada proses Bottling. Jurnal Vorteks, vol. 2, no.2, 2021, pp. 85-90.

S. Novita., H, Arif., and A. Sakunda. Analisis Pengukuran Waktu Kerja Dengan Metode Pengukuran PT Japfa Comfeed Indonesia Tbk. Skripsi. Universitas Bawijaya. Malang.2013.

Marathony, B.M. Pengukuran Waktu Baku Pada Proses Pembuatan Roda Gigi Di PT Taman Pratama, (Doctoral dissertation, http://unugha.ac.id). 2016

Sucipto, A.N., Syamsuddin, S.R., Bagas, D.A,. and Tahoba, A. Laporan Praktikum Analisa Perancangan Kerja. Universitas Muhammadiyah Sorong. 2020

Aryanto, Y.A. Pengukuran Waktu Kerja Metode Jam Henti. Retrieved Oktober, 19, 2022, from https://angga.staff.ipb.ac.id/?p=930 . 2018

Rahma, M., and Pratama, A. J. Pengukuran Waktu Baku Stasiun Kerja Perakitan Komponen Pesawat Garuda Indonesia Temperature Control Valve (TCV) Menggunakan Metode Jam Henti Pada PT. GMF Aeroasia. IENACO (Industrial Engineering National Conference) 7 2019.

Prayuda, S. B. Analisis Pengukuran Kerja Dalam Menentukan Waktu Baku Untuk Meningkatkan Produktivitas Kerja Pada Produksi Kerudung Menggunakan Metode Time Study Pada Ukm Lisna Collection Di Tasikmalaya. Jurnal Mahasiswa Industri Galuh, vol. 1 no. 01,2020, pp. 120-126.

Downloads

Published

2023-03-31

How to Cite

[1]
masniar masniar, U. R. Marasabessy, E. Astrides, Asih Ahistasari, M. . A. Nur Wahyudien, and M. M. Rachmadhani, “Analysis of Work Measurement Using the Stopwatch Time Study Method at PTEA”, JISEM, vol. 2, no. 1, pp. 23–31, Mar. 2023.