Reducing Waste by Implementing Just in Time Method at PT. Uwe Molino Luwuk
DOI:
https://doi.org/10.56882/jisem.v3i2.42Keywords:
Just in time, Waste, Value Stream MappingAbstract
The manufacturing industry is one of the important sectors in the Indonesian economy. PT. Uwe Molino Luwuk is one of the manufacturing companies that offers bottled drinking water (AMDK) products. This company still has several problems related to waste in its production process. This situation is also reflected in the loss of time during the production process. This waste can cause great losses for the company. This study aims to optimize production to reduce waste can be done by applying the Just In Time (JIT) method through the Value Stream Mapping (VSM) data analysis technique. The results of the study showed that the dominant waste in the top order was waiting. Developing improvements from the current to the future state, the lead time value of the material on the production floor was faster, in the VSM before 510 minutes while the lead time of the VSM after was 310 minutes. So there is a reduction in time of around 60.7%.
References
P. S. Istiqomah, W. Vidya Nandita, dan N. P. Sayekti, “Pengaruh Implementasi Konsep Just-in-Time terhadap Efisiensi Operasional dan Pengendalian Biaya di Perusahaan Manufaktur (Studi Kasus PT Waskita Karya Tbk),” Pengaruh Implementasi Konsep Just-In-Time (Putri Silvia Istiqomah, dkk) Madani J. Ilm. Multidisiplin, vol. 221, no. 6, hal. 221–230, 2023, [Daring]. Tersedia pada: https://doi.org/10.5281/zenodo.8117594
T. M. Hogg, “Lean Manufacturing,” Hum. Syst. Manag., vol. 12, no. 1, hal. 35–40, 1993, doi: 10.3233/HSM-1993-12106.
A. A. A. P. P. Wipajung, Salmia, dan T. Priyasmanu, “Meminimalkan Waste Menggunakan Metode Value Stream Mapping dan Failure Mode and Effect Analysis pada Lini Produksi Usaha Shuttlecock Prospek,” J. Mhs. Tek. Ind., vol. 6, no. 2, hal. 212–219, 2023.
U. Koester, “Food Loss and Waste as an Economic and Policy Problem,” Intereconomics, vol. 49, no. 6, hal. 348–354, 2014, doi: 10.1007/s10272-014-0518-7.
M. S. Ummah, “ANALISIS PENINGKATKAN EFISIENSI BIAYA PRODUKSI DENGAN METODE JUST IN TIME (JIT),” 2019.
H. S. W., “Penerapan Just in Time dalam Sistem Pembelian dan Sistem Produksi,” Binus Bus. Rev., vol. 2, no. 1, hal. 446, 2011, doi: 10.21512/bbr.v2i1.1151.
A. H. Balich dan K. D. L. Mutia, “‘Ixxes’ Kupang,” J. Akunt. Transparansi dan Akuntabilitas, vol. 8, no. 1, hal. 73–78, 2020.
R. Adolph, “ANALISIS PENERAPAN JUST IN TIME DALAM MENINGKATKAN EFISIENSI PRODUKSI PADA PT. CIPTA BETON SINAR PERKASA DI MAKASSARe,” hal. 1–23, 2016.
B. Shadrina Zhafarin et al., “Peranan Just in Time Method dalam Upaya Mengeliminasi Non Value Added Activity di Perusahaan: Literature Review,” J. Ilm. Ilmu Kesehat. dan Kedokt., vol. 1, no. 3, hal. 10–21, 2023, [Daring]. Tersedia pada: https://doi.org/10.55606/termometer.v1i3.1795
A. A. Rahman, “Penerapan Sistem Produksi Just In Time (JIT) Untuk Meningkatkan Kinerja Produksi Sesuai Permintaan Di Bengkel Agus Las,” 2023, [Daring]. Tersedia pada: https://repositori.uma.ac.id/handle/123456789/20090
B. M. Musfita dan N. A. Mahbubah, “Implementasi Lean Manufacturing Guna Meminimalisasi Pemborosan Pada Proses Produksi AMDK Jenis Gelas Pada PT.XYZ,” J. Serambi Eng., vol. 6, no. 2, hal. 1683–1693, 2021, doi: 10.32672/jse.v6i2.2864.
D. R. Ayu dan B. N. Alfa, “Pengurangan Pemborosan Dengan Metode Value Stream Mapping Pada Proses Penyediaan Medicines & Consumables Di Perusahaan Jasa Kesehatan Dki Jakarta,” J. PASTI (Penelitian dan Apl. Sist. dan Tek. Ind., vol. 16, no. 3, hal. 360, 2023, doi: 10.22441/pasti.2022.v16i3.010.
S. Arunizal, D. H. Wardhani, dan J. Windarta, “Penerapan Value Stream Mapping ( VSM ) untuk Menurunkan Lead Time Process dan Meningkatkan Kinerja Aktivitas Pengadaan di Site Tambang,” vol. 2, no. 3, hal. 141–150, 2024.
D. Rika Widianita, “Identifikasi dan Eliminasi Waste Untuk Mengurangi Lead Time Pada Proses Produksi Menggunakan Pendekatan Lean Manufacturing,” AT-TAWASSUTH J. Ekon. Islam, vol. VIII, no. I, hal. 1–19, 2023.
I. P. Widnyana, I. W. Ardiana, E. Wolok, dan T. Lasalewo, “Penerapan Diagram Fishbone dan Metode Kaizen untuk Menganalisa Gangguan pada Pelanggan PT PLN (Persero) UP3 Gorontalo,” Jambura Ind. Rev., vol. 2, no. 1, hal. 1–9, 2022, doi: 10.37905/jirev.2.1.11-19.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Journal of Industrial System Engineering and Management

This work is licensed under a Creative Commons Attribution 4.0 International License.