Performance Evaluation of Fixed Crane Operations Using Overall Equipment Effectiveness Method in Port Container Handling Activities
DOI:
https://doi.org/10.56882/jisem.v4i2.56Keywords:
Overall Equipment Effectiveness (OEE), Fixed Crane Performance, Port Operations, Maintenance Management, Equipment ReliabilityAbstract
Efficient container handling is crucial to maintaining productivity and competitiveness in port operations. This study evaluates the performance of fixed crane equipment using the Overall Equipment Effectiveness (OEE) method to identify factors contributing to productivity loss. Data were collected through observation, interviews, and operational records, focusing on loading time, downtime, operation time, processed amount, and defect rate. The analysis assessed three OEE indicators: availability, performance efficiency, and quality rate. Results revealed that crane availability ranged from 84–86%, performance efficiency from 14–21%, and quality rate remained at 100%. The overall OEE value of 12–18% was significantly below the world-class standard of 85%, indicating low operational efficiency. The primary causes of reduced effectiveness included operator negligence, overloading, and insufficient radiator maintenance. To enhance reliability, the study suggests introducing a 200-hour preventive maintenance schedule emphasizing radiator inspection, operator training, and strict load monitoring. The research demonstrates that applying the OEE framework allows port managers to quantify equipment performance, identify major loss sources, and implement targeted strategies to reduce downtime and improve throughput in container handling operations
References
Q. Li, R. Yan, L. Zhang, and B. Yan, “Empirical study on improving international dry port competitiveness based on logistics supply chain integration: evidence from China,” The International Journal of Logistics Management, vol. 33, no. 3, pp. 1040–1068, Aug. 2022, doi: 10.1108/IJLM-06-2020-0256.
R. Malik, N. Rauf, T. Alisyahbana, A. Ahmad, and A. Fole, “Scheduling Maintenance Proposal For Turbine Machines Using The Age Replacement Method At Balambano Hydroelectric Power Plant PT. Vale Indonesia Tbk.,” Journal of Industrial Engineering Management, vol. 9, no. 1, pp. 69–76, 2024, doi: 10.33536/jiem.v9i1.1841.
M. Koray, E. Kaya, and M. H. Keskin, “Determining Logistical Strategies to Mitigate Supply Chain Disruptions in Maritime Shipping for a Resilient and Sustainable Global Economy,” Sustainability, vol. 17, no. 12, p. 5261, Jun. 2025, doi: 10.3390/su17125261.
S. Aslam et al., “Machine Learning-Based Predictive Maintenance at Smart Ports Using IoT Sensor Data,” Sensors, vol. 25, no. 13, p. 3923, Jun. 2025, doi: 10.3390/s25133923.
A. S. Kalafatelis, N. Nomikos, A. Giannopoulos, G. Alexandridis, A. Karditsa, and P. Trakadas, “Towards Predictive Maintenance in the Maritime Industry: A Component-Based Overview,” J Mar Sci Eng, vol. 13, no. 3, p. 425, Feb. 2025, doi: 10.3390/jmse13030425.
C. Lundgren, J. Bokrantz, and A. Skoogh, “Performance indicators for measuring the effects of Smart Maintenance,” International Journal of Productivity and Performance Management, vol. 70, no. 6, pp. 1291–1316, Jun. 2021, doi: 10.1108/IJPPM-03-2019-0129.
A. Mail, M. Dahlan, N. Rauf, N. Chairany, A. Ahmad, and K. Jufri, “Analysis Of The Effectiveness Of Clean Water Distribution Machine Using Overall Equipment Effectiveness (OEE) Method,” Journal of Industrial Engineering Management, vol. 6, no. 1, pp. 49–56, May 2021, doi: 10.33536/jiem.v6i1.884.
T. N. Wiyatno and H. Kurnia, “Increasing Overall Equipment Effectiveness in the Computer Numerical Control Lathe Machines Using the Total Productive Maintenance Approach,” OPSI, vol. 15, no. 2, pp. 284–292, 2022, doi: 10.31315/opsi.v15i2.7284.
F. N. Diansyah and A. Adhiutama, “International Journal of Current Science Research and Review Total Productive Maintenance Strategy to Increase Overall Equipment Effectiveness of Integrated Filling Machine N2 Vaccine Production Pt. Xyz,” International Journal of Current Science Research and Review, vol. 6, no. 7, pp. 4794–4809, 2023, doi: 10.47191/ijcsrr/V6-i7-97.
Z. Tian Xiang and C. Jeng Feng, “Implementing total productive maintenance in a manufacturing small or medium-sized enterprise,” Journal of Industrial Engineering and Management, vol. 14, no. 2, p. 152, Feb. 2021, doi: 10.3926/jiem.3286.
J. I. Hernández Vázquez, J. O. Hernández Vázquez, S. Hernández González, and D. A. Olivares Vera, “Optimization of the OEE indicator through meta-models’ simulation in the buffer allocation problem,” Journal of Industrial Engineering and Management, vol. 17, no. 1, pp. 275–291, Apr. 2024, doi: 10.3926/jiem.6572.
S. Raju, H. A. Kamble, R. Srinivasaiah, and D. R. Swamy, “Anatomization of the overall equipment effectiveness (OEE) for various machines in a tool and die shop,” Journal of Intelligent Manufacturing and Special Equipment, vol. 3, no. 1, pp. 97–105, May 2022, doi: 10.1108/JIMSE-01-2022-0004.
R. M. Alrebati, M. AlDurgam, M. Nabhan, and A. Nasir, “A Markov Decision Process model for maximizing overall equipment effectiveness,” J Qual Maint Eng, vol. 31, no. 2, pp. 260–285, Jun. 2025, doi: 10.1108/JQME-10-2024-0099.
R. I. Riana, T. Immawan, and Y. Herdianzah, “Supply Chain Risk Management for Waste Management Strategy Using House of Risk,” Metode : Jurnal Teknik Industri, vol. 11, no. 1, pp. 138–147, Mar. 2025, doi: 10.33506/mt.v11i1.4149.
A. Mail, M. Dahlan, N. Rauf, A. N. Chairany, A. Ahmad, and K. Jufri, “Analysis Of The Effectiveness Of Clean Water Distribution Machine Using Overall Equipment Effectiveness (OEE) Method,” Journal of Industrial Engineering Management, vol. 6, no. 1, pp. 49–56, May 2021, doi: 10.33536/jiem.v6i1.884.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Journal of Industrial System Engineering and Management